First: what counts as a "large-scale" data center
The whole water law turns on one definition, in section 373.203 of the Florida Statutes. A data center is a facility that primarily contains electronic equipment used to process, store, and transmit digital information — either a free-standing structure, or a facility inside a larger structure with its own environmental controls. A large-scale data center is a single location with a data center on site whose anticipated monthly peak electrical load is 50 megawatts or more, calculated as the highest average load over a 15-minute interval.
Three details in that definition do real work. First, the line is drawn on electricity, not water: 50 megawatts of peak load is roughly the demand of a small city, and a site that big is the class of facility whose cooling can move an aquifer. Second, the load cannot be added up across multiple locations owned by the same customer to reach the line — but every tenant sharing one location under a colocation (shared-building) agreement counts toward that location's total, so a building full of smaller tenants is still large-scale if the building's peak clears 50 megawatts. Third, a customer may not split one site's electrical load into several smaller connections to duck under a related threshold in the law's power sections. Below 50 megawatts at one location, this water law does not apply at all — a smaller data center goes through the ordinary permit process like any other business. For how much water facilities of different sizes actually use, see the full guide: How much water does a data center use?
The two grounds on which a water permit must be refused
Section 373.262(2) gives two independent reasons a district or the DEP may not issue the permit:
- Harm: the proposed use of the water is harmful to the water resources of the area. That phrase is the law's own, and it is deliberately broad — the statute does not define it down to a gallon figure, so what counts as harmful is decided case by case, in the district where the aquifer actually sits.
- Local prohibition: the project is prohibited by the applicable local government zoning regulations and comprehensive plan. In plain terms: if the city or county has lawfully zoned the project out, the water district cannot permit it back in. A companion section of the same law (section 163.326) confirms that local governments keep their planning and land-development authority over these large load customers.
The same subsection states the other side of the rule just as plainly: a permit shall be issued if the applicant establishes all three parts of Florida's long-standing permit test — (1) the use is a reasonable-beneficial use, as defined in section 373.019; (2) it will not interfere with any presently existing legal use of water; and (3) it is consistent with the public interest. So the law is not a ban. It is a gate with the test written on it: pass the three-part test and stay clear of the two refusal grounds, and the permit issues; fail, and for the first time a Florida data center's water can be stopped at the permit counter on harm grounds alone. The permit system behind all of this — who may pump, how much, and who decides — is explained in Who owns the water?
Reclaimed water: required, but only when five conditions all line up
Section 373.262(3) is the part of the law most often described loosely, so here it is exactly. The district or the DEP shall require — must require, not merely may require — the use of reclaimed water in place of all or part of a large-scale data center's proposed surface water or groundwater use, when all five of these are true:
- A suitable reclaimed water supply source is available and permitted;
- Reclaimed water distribution or supply lines are available at the property boundary, in sufficient capacity and quality to serve the applicant's needs;
- The applicant can actually access that source through those lines;
- Using reclaimed water is environmentally, economically, and technically feasible; and
- Using it would not conflict with the requirements of the applicant's surface water discharge permit, if it has one.
Read the second condition closely, because it is where the rule's reach is set: the reclaimed-water main must already reach the property line. Where no utility has built reclaimed lines to the site, the mandate does not bite — the law does not order anyone to build the pipe. That is the honest limit of the provision, and it is also what makes reclaimed water the hinge of the whole law: the wastewater utility that extends a reclaimed main to an industrial area is, from that day on, the supplier a large data center may be required to buy from. Reclaimed water stops being only an irrigation product and becomes an industrial water supply.
The paperwork bar: full water accounting, a conservation plan, and a hearing
For any large-scale data center application asking for an average daily flow of 100,000 gallons of water per day or more, section 373.262(4) adds two requirements on top of the normal application rules in section 373.229. The application must itemize all sources and amounts of water, and all losses of water, used for cooling, for industrial and treatment processes, for employees' personal and sanitary needs, and for landscape irrigation. And it must include a water conservation plan that, at a minimum, recycles cooling water before discharge or disposal, runs a leak detection and repair program, uses water-efficient fixtures, and runs an employee awareness and education program on water conservation.
Then the procedural change that may matter most in practice: notwithstanding the usual rule that lets some applications be approved without one, the district or the DEP may not approve a large-scale data center's permit application without a hearing. Every approval gets a public proceeding. And if a permitted large-scale data center later wants to change its permit, section 373.239(2), as amended by this law, treats that modification application the same way as an initial application — there is no quiet amendment path around the hearing and the test.
For scale: the 100,000-gallon-a-day disclosure line is twice the roughly 50,000 gallons a day reported — as an estimate, not a permit figure — for the proposed Fort Meade campus in Polk County, whose Southwest Florida Water Management District (SWFWMD) water permit was still pending at last report. A campus at that reported size, if it qualifies as large-scale on the power test, would face the hearing and the harm test even below the extra-disclosure line. The regional stakes are in the scarcity guide: Is Florida running out of water?
The rest of the law, in one pass
SB 484 is wider than water, and three of its other pieces explain the water piece. On power costs, new section 366.043 requires public utilities to set minimum tariff and service requirements so that each large load customer bears its own full cost of service — connection, added transmission and generation, operations — with the cost and the risk of nonpayment kept off the general body of ratepayers; each public utility had to file a complying tariff with the Florida Public Service Commission (PSC) by October 1, 2026. On local control, section 163.326 keeps comprehensive planning and land development regulation of large load customers with local governments, and provides that a large load customer may not be treated as an electric substation. On transparency, the law removes data centers from an exception that let economic development agencies extend confidentiality for project information by an extra 12 months. Finally, the Office of Program Policy Analysis and Government Accountability (OPPAGA) — the Legislature's own research office — must contract for an independent study of large-scale data center construction and operation, covering land, water, energy, and cost impacts, and deliver it to the Governor, the President of the Senate, and the Speaker of the House by July 1, 2027. That study is the law's own built-in second look.
What the law does not do — and what would change this reading
It does not ban data centers, large or small, anywhere in Florida. It does not set a gallon cap, a cooling-technology mandate, or a statewide water budget for the industry. It does not touch data centers under the 50-megawatt line, farms, bottlers, or any other water user — they remain under the ordinary Chapter 373 permit system described in Tampa Bay permits and the ownership guide. And as of this briefing, no denial of a data center water permit under section 373.262 has been verified — the provision has been law for under five months, and its first real test will be a contested application, not a press release. What would change this briefing's reading: a district rule or court decision narrowing the phrase "harmful to the water resources of the area," the OPPAGA study's findings in 2027, or the first permit decision — grant or denial — that puts section 373.262 to work. When one lands, this briefing stays as the record of the law as written, and the linked guides carry the update.
Sources
- Chapter 2026-65, Laws of Florida — the enrolled text of Committee Substitute for Committee Substitute for Senate Bill 484 (CS/CS/SB 484, 2nd Engrossed, 2026484er), Florida Senate official bill text, read in full for this briefing: section 4 creating the definitions in section 373.203 (data center; large-scale data center at 50 megawatts or more of anticipated monthly peak load, highest average over a 15-minute interval, single location, colocation counted, cross-location aggregation excluded); section 5 creating section 373.262 (legislative intent; the two refusal grounds in subsection (2) — harmful to the water resources of the area, or prohibited by local zoning regulations and comprehensive plan; the shall-issue three-part test; the five-condition reclaimed-water mandate in subsection (3); the 100,000-gallon-per-day disclosure and conservation-plan requirements and the no-approval-without-a-hearing rule in subsection (4)); section 6 amending section 373.239(2) (large-scale data center modifications treated as initial applications); section 3 creating section 366.043 (large load customers bear their full cost of service; tariffs filed by October 1, 2026); section 1 creating section 163.326 (local planning authority); section 7 (OPPAGA study due July 1, 2027); section 8 (general effective date July 1, 2026, with specified sections effective on becoming law).
- Florida Statutes, section 373.203, as published on Online Sunshine (the Legislature's official statutes site), read for this briefing: the data center and large-scale data center definitions as codified, matching the enrolled text word for word.
- Florida House of Representatives, official bill page for CS/CS/SB 484 (2026), read for this briefing: Approved by Governor May 7, 2026; Chapter No. 2026-65 recorded May 8, 2026; Effective Date July 1, 2026 except as otherwise provided; final votes — Senate 37 to 0 (February 26, 2026), House 92 to 16 (March 11, 2026), Senate concurrence 31 to 6 (March 13, 2026).
- Florida Senate, Bill Analysis and Fiscal Impact Statement for CS/CS/SB 484 (Rules Committee, February 18, 2026), read for this briefing as a second route on the bill's structure; where its summary wording ("authorizes districts to require some portion of reclaimed water") differs from the enrolled text ("shall require" when the five conditions are met), this briefing follows the enrolled text.
- Carlton Fields, law-firm analysis of SB 484, used as a lead only and checked against the enrolled text above; no fact in this briefing rests on it alone.
- Fort Meade campus context (roughly 50,000 gallons per day, permit pending): Water Treatment Market research file, water-issues cluster, November 18, 2026 — carried here as an estimate from project documents via local reporting, exactly as labeled there; the permit application itself was not read for this briefing.
Keep going
- How much water does a data center use? — the full data center guide
- Who owns the water? — Florida's use-right rule and the permit system
- Is Florida running out of water? — the full scarcity guide
- Florida water restrictions in 2026 — yesterday's briefing
- Your city's water quality report
- Find a license-verified water treatment provider
- More Latest briefings